Cairo Electricity Production Company
CEPC Station

Shoubra El-Khiema

Dummy

Installed Capacity

:

1260 MW + 35 MW=1295 MW


Commercial Operation

: 1984 - 1988


investments

:

792 million pounds including foreign currency equivalent to 670 million pounds


Consultant

: Bechtel


Contractors

:

Westinghouse (Turbine) Ansaldo (Boilers) TOSHIBA (Transformers& Switchgear) Adica ,Mitsoi


Fuel Type

:

Dual Fuel(Natural gas as a main fuel - Fuel oil as reserve fuel)


security

:

The station is electronically secured by cameras on the outside fence .